Форма представления | Статьи в зарубежных журналах и сборниках |
Год публикации | 2021 |
Язык | русский |
|
Ибатуллина Анна Анатольевна, автор
|
Библиографическое описание на языке оригинала |
Ibatullina A.A. The concept of project management at the meso-level on the basis of network planning of works with the development of methods of labor costs optimization / A.A. Ibatullina, A.R. Safiullin // International Journal for Quality Research. - 2021. - V.15, № 2. – Р. 579-594. |
Аннотация |
International Journal for Quality Research. |
Ключевые слова |
project management, optimization, labor
costs, industry project, industrial policy,
instrumentation |
Название журнала |
International Journal for Quality Research.
|
Ссылка для РПД |
http://dspace.kpfu.ru/xmlui/bitstream/handle/net/166567/F_10._T_E_CONCEPT_OF_PROJECT_MANAGEMENT_AT_T_E_MESO_LEVEL.pdf?sequence=1&isAllowed=y
|
Пожалуйста, используйте этот идентификатор, чтобы цитировать или ссылаться на эту карточку |
https://repository.kpfu.ru/?p_id=261909 |
Файлы ресурса | |
|
Полная запись метаданных |
Поле DC |
Значение |
Язык |
dc.contributor.author |
Ибатуллина Анна Анатольевна |
ru_RU |
dc.date.accessioned |
2021-01-01T00:00:00Z |
ru_RU |
dc.date.available |
2021-01-01T00:00:00Z |
ru_RU |
dc.date.issued |
2021 |
ru_RU |
dc.identifier.citation |
Ibatullina A.A. The concept of project management at the meso-level on the basis of network planning of works with the development of methods of labor costs optimization / A.A. Ibatullina, A.R. Safiullin // International Journal for Quality Research. - 2021. - V.15, № 2. – Р. 579-594. |
ru_RU |
dc.identifier.uri |
https://repository.kpfu.ru/?p_id=261909 |
ru_RU |
dc.description.abstract |
International Journal for Quality Research. |
ru_RU |
dc.description.abstract |
The relevance of the study is due to the lack
of a unified approach to implementation of projects
at the federal level, article aims at developing a
mechanism for managing labor costs of the project.
The leading approach to the study of the problem is
the development of the matrix “specializationcompetence”and a mechanism for optimizing labor
costs. Testing was carried out in JSC “Kazan
ElectrotechnicalPlant”. The regions-leaders of
instrument-making are defined. In the project No. 1
there was a decrease in labor costs by 19%, overtime
by 3 times, the cost of 1 standard hour by 4%.As a
conclusion, the theoretical aspects of an integrated
approach to the management of industry projects are
put forward. The materials of the article are valuable
for the management of the region's economy.
Keywords: project management, optimization, labor
costs, industry project, industrial policy,
instrumentation |
ru_RU |
dc.language.iso |
ru |
ru_RU |
dc.subject |
project management |
ru_RU |
dc.subject |
optimization |
ru_RU |
dc.subject |
labor
costs |
ru_RU |
dc.subject |
industry project |
ru_RU |
dc.subject |
industrial policy |
ru_RU |
dc.subject |
instrumentation |
ru_RU |
dc.title |
The concept of project management at the meso-level on the basis of network planning of works with the development of methods of labor costs optimization |
ru_RU |
dc.type |
Статьи в зарубежных журналах и сборниках |
ru_RU |
|